3,132 screw piles delivered Australia’s largest battery storage project faster than concrete.
A foundation
And promises matter most
Never over-engineered.
Never under-engineered.
Australia builds on concrete by default, not because it’s always the right answer, but because it’s the familiar one. We engineer every foundation to the actual site, the actual loads and the actual design life of the building above it.
We carry the risk,
so you don’t have to explain it.
A foundation failure is not a line item; it’s a liability. We take responsibility for the engineering, carry the technical risk and stand behind the documentation, so the people signing off on the project above ours aren’t the ones left carrying it.
Minimal disturbance,
maximum access.
Traditional footings mean excavation, spoil removal and wet trades on site for days. Screw piles go in with minimal disturbance and no concrete truck queuing at the gate, so remote, tight, and sensitive sites are no harder to build on than easy ones.
Projects Delivered
Compliance
of the time
Built for the sectors that can’t afford a foundation that isn’t right

Modular & Prefab
Fast, and properly engineered for residential and commercial builds

Energy & BESS
Speed, reliability and compliance — proven at gigawatt scale

Mining & Remote Camps
Verified capacity, delivered to sites that others can’t service

Government
Compliance and social procurement built in, not bolted on

Civil & Infrastructure
The engineered answer when the standard method won’t work

Residential
The same rigour, whether it’s one pile or ten thousand
Proof, not promises
Eva Copper Mine Workers’ Camp, Cloncurry
1,358 piles installed in 41 days on a remote mine site.
QBuild Remote Housing Program
Engineered foundations for remote Queensland housing where concrete wasn’t practical.
Our Clients











Start the conversation
No cost, no commitment — just a chance to see if we’re the right fit.
Enquiry Form
"*" indicates required fields




