Energy & BESS

Foundations engineered for battery storage, at national scale

Battery storage infrastructure is only as reliable as what it’s standing on. FTA has delivered 10,000+ screw piles for the largest BESS project in Australia, in partnership with Radix UK, and we bring the same engineering discipline to projects of any scale.

Why FTA for energy and BESS

Compliance at scale. Every pile torque-verified and documented, on a project size where that documentation matters to financiers and asset owners, not just certifiers.

Concept-stage engagement. We work with developers and EPCs early, when foundation strategy is still being decided, not just when tenders open.

A partner in the OEM conversation. Our Radix partnership connects directly into the compliance discussions global battery manufacturers are already having.

Point of difference

Most foundation contractors size a job. We engineer it. For the loads, the soil, and the 50-plus-year asset life a BESS site is built for.

Wide ground-level view of an industrial battery storage site showing multiple parallel rows of driven steel foundation posts, with an excavator and rough-terrain forklift working in the background near commercial warehouses and power lines.

Energy & BESS project examples

Talk to us

Speak to one of our BDMs about your next project.